Tuesday, February 22, 2011

Drywall...

There was a lot of drywall work to do on this house.  Much of the house had wood paneling which we removed, and it will be replaced with drywall.  Some of the drywall was removed due to being moldy from water leaks in the past.  And since we exposed the original taller ceilings, we needed to cover those with drywall as well.

Hallway prepared for drywall.  Stacks of drywall waiting to be hung. The vintage phone stand found elsewhere in the house was placed in its new location.
Kitchen downstairs. Cement board installed for tile.
Upstairs hallway
Upstairs bedroom
Upstairs HVAC duct raceway insulated and ready for drywall.

No comments:

Post a Comment