Monday, August 8, 2011

More AC Work

The AC company finally came out a week later than promised to perform repairs on their existing ducts and to add the new return duct.  They did the work in a couple of days and left when they were finished. 

When we came to look at the work, we found that they left our front door unlocked.  Luckily, it looks like no one came in and stole anything. This was very alarming. 

We found that the work was done very poorly. 

Ducts in the attic pierced by roof nails.

Torn open ducts

Crushed ducts - this party explains our lack of air flow

More crushed ducts
These types of tears in the ducts are all over the place under our house.
 
Unfortunately, they had to cut our finished drywall to run the AC ducts from the attic down to the crawl space of the house.  I guess its lucky we didn't paint yet.  Hopefully, the drywall can be repaired, so that there is no trace of these cut outs.

Finished drywall cut out to access the ducts in downstairs kitchen

Finished drywall cut out to access ducts upstairs


This was about the sixth time that the AC company came out, and their quality of work is very poor each time.  Each time they come out, they also cause some sort of damage to existing ducts such as tearing open nearby ducts close to where they are working.  We finally realized that they are simply not capable of doing a reasonable quality job.  We had no choice but to fire them and are now planning to find another AC company repair our HVAC system.

As a result of this, our work on the house comes to a standstill.  It is nearly impossible to continue working on the house in the summer heat when the AC is turned off.