Friday, March 4, 2011

The Drywall is Done!

The drywall was put up on both the downstairs and upstairs.  It took the guys roughly 4 weeks to finish the job which is far longer than the contractor anticipated.  Everything about this house seems to defy time estimates, so that is nothing new.

Now our house is starting to look like a real house.  We just hope that we have successfully fixed all of the leaks! 

Front door and hallway

Hallway, note the vintage built-in telephone stand.  It was moved from another room in the house.

Kitchen entrance upstairs
Hallway upstairs

Living room and entrance to bedroom upstairs

Kitchen downstairs with plumbing for the island

Living room downstairs
Now we have a lot of cleaning to do. There is drywall dust all over the walls, ceilings, and floors.  After that it will tile and painting.  Hmmm, I wonder which one we will tackle next; tile I guess because the plumber needs the tile done to install the bathroom fixtures.

No comments:

Post a Comment